Diary (last update 2023/04/19)
Drilling diary (last update 2022/08/10)
Borehole seismometer (last update 2023/04/19)
Depth* : from cable length meter
Depth** : from DAS comparison (Yen-Yu)
Mis-orientation* : by Youngman
Mis-orientation** : by Yen-Yu
2022/11/25 hole A rearrangement
1) fiber path change: hole A first and then hole A surface
2) hole A add 3 components horizontal strain
2022/10/06 iDAS moves from cargo cabinet A to cargo cabinet B
2022/09/04 Hole B container rearrangement
hole B container rearrangement (2022/09/02 - 2022/09/04)
2022/06/14 CHT repair
cable damage found in the fiber length of 2850m (CHT) due to road maintain and repair done on 2022/06/14
2022/06/08 Hole A repair
cable damage found in the fiber length of 1500m (2022/06/06) and repair done (2022/06/08).
2022/06/02 Hole B done
Right after hole B cable installation was done, the single-mode fibre was spliced to iDAS for whole cable observation and multi-mode fibre was spliced to DTS for cement monitor.
2022/05/06 Hole A surface repair
Due to a dog bite damage in the area around the hole A wellhead, we replice and replace hole A surface cable.